We sold this 36×6’ Medium-Duty Bridge Kit to the East Bay Municipal Utility District in California. The bridge will be used for a pedestrian and equestrian creek crossing. They built the bridge offsite and then trailered it in to the final location. The lightweight design was easily maneuvered by one of their tractors and ultimately set in place by a small crane. Arthur, the project leader, was very happy with the process and result. He is itching to replace a few more of their old, rotting bridges in the next few years.